The Neutrino Factory and Muon Collider Collaboration (NFMCC) Logo


Neutrino Factory/Muon Collider Document 316-v1

New and Efficient Neutrino Factory front-end Design

Document #:
NFMCC-doc-316-v1
Document type:
MuCool Note
Submitted by:
John Urish
Updated by:
John Urish
Document Created:
26 Apr 2005, 12:00
Contents Revised:
26 Apr 2005, 12:00
Metadata Revised:
26 Apr 2005, 12:00
Actually Revised:
14 Sep 2006, 13:35
Viewable by:
  • Public document
Modifiable by:
  • Same as Viewable by

Quick Links:
Latest Version

Abstract:
NEW AND EFFICIENT NEUTRINO FACTORY FRONT-END DESIGN
\author{J.C.~Gallardo\thanks{Correspondent: gallardo@bnl.gov}, J.S.~Berg,
R.C.~Fernow, H.~Kirk, R.B.~Palmer, BNL, Upton, NY 11973, USA
D.~Neuffer, FNAL, Batavia, IL 60510, USA;
K.~Paul, Muons, Inc., Batavia, IL 60510, USA}

The front-end of a neutrino factory (the part of the facility between the
target and the first linear accelerator) represented a large fraction,
about $40\,\%,$ of the
total facility costs as discussed in a rather comprehensive feasibility
study (FS2)~\cite{fs2}. Several recent developments, briefly summarize in
this article, lead to the idea that a new design for the front end may be
possible and that it is significantly less expensive than the front end
used in FS2.

This is a PDF document
Posted by Juan C. Gallardo

Files in Document:
Other Files:
Keywords:
COOL_THEORY
Notes and Changes:
J.C. Gallardo, J.S. Berg, R.C. Fernow, H. Kirk, R.B. Palmer, D. Neuffer, K. Paul
Publication Information:
Submitted to Proceedings of the Particle Accelerator Conference PAC05
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory


For assistance contact HelpDesk
Last Modified by MT on 6 February 2006
DocDB Home



DocDB Version 8.8.9, contact Document Database Administrators