The Neutrino Factory and Muon Collider Collaboration (NFMCC) Logo


Neutrino Factory/Muon Collider Document 322-v1

Estimation of Study IIb costs based on Study II

Document #:
NFMCC-doc-322-v1
Document type:
MuCool Note
Submitted by:
John Urish
Updated by:
John Urish
Document Created:
09 Aug 2005, 12:00
Contents Revised:
09 Aug 2005, 12:00
Metadata Revised:
09 Aug 2005, 12:00
Actually Revised:
14 Sep 2006, 13:35
Viewable by:
  • Public document
Modifiable by:
  • Same as Viewable by

Quick Links:
Latest Version

Abstract:
Starting from a Study II Work Breakdown, element costs per unit length, integral RF Voltage, or net acceleration are derived. These costs are then applied to the Study IIb parameters after scaling for magnetic fields, radii, stored energy, rf gradient etc. Savings relative to Study II are given. Relative savings by subsystem are also given.

This is a PDF document
Posted by R. B. Palmer

Files in Document:
Other Files:
Keywords:
NEUTRINO_SRC
Notes and Changes:
R.B.Palmer
M. Zisman
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory


For assistance contact HelpDesk
Last Modified by MT on 6 February 2006
DocDB Home



DocDB Version 8.8.9, contact Document Database Administrators